How Do I
Jump to a Department

Go To Search
Click to Home
Minuteman Regional Vocational Technical School
Planning Board Site Plan Review
Updated: January 9, 2017

Minuteman Regional Vocational Technical School has indicated that they will file a Site Plan Review application.

A preliminary meeting with the Planning Board will be held first followed by a public hearing for Site Plan Review. Tentative dates are February 14, 2017  for the Preliminary Site Plan review (this is when the Planning Board meets with the applicant informally to review submittal) and February 28, 2017 for the public hearing which requires abutter notification.  These are place holders on the agenda but no application has been filed. 

The Applicant stated that they will keep the existing school while the new school is being built. The proposed building is unchanged from what was proposed 6-months ago. The new school will have approximately 625 students and hope to being construction in late spring/early summer. The area consists of 65.71 acres with a portion in Lexington and a portion in Lincoln. The current school is located in Lexington. The new school will be located in Lincoln. The proposed access to the school will remain the same.

As part of the Site Plan review the Board will look at:
  • Landscaping
  • Relation of Building to Environment
  • Building Design and Landscaping
  • Open Space
  • Circulation
  • Screening

To view a concept plan https://www.dropbox.com/s/fh9bot2z2yxou61/Site%20Plan%20Minuteman%20Oct%202016.pdf?dl=0

Click here to view supporting documents

Link to School

This page will be updated on a continuous basis.